Welcome, Guest |
TOPIC:
Emilio's Place 8 years 6 months ago #811
My drugs have finally arrived. Might just eat sime right now. Em Note: Picture removed as it identified one of the compounding chemists that are helping. The PCCA sent a letter to their members saying they should not. Some compounding chemists have chosen to ignore that and help. Let's just carry on with a minimum of fuss. Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Emilio's Place 8 years 6 months ago #823
I had my baselines drawn last Friday (FBC;UEC;LFT;ViralLoad) so done and dusted. I guess there is a chance that it all goes amiss and if so bad luck as this train now stops at 18 weeks. Dr Freeman should get those results this week. Em Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Emilio's Place 8 years 6 months ago #824
notice the small amount extra with the sofos 7 x 12 = 84 (90) and daclats 7 x 12 = 84 (100). So 6 additional days with the sofos and 16 days with the daclats. I'm now in the process of ordering my additional 6 weeks, just to be sure. Em Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Emilio's Place 8 years 6 months ago #828
Hi tweak I believe I'm an F3 in terms of damage so not cirrhotic but reasonably advanced, so I'm hedging my bet so to speak. Look if I can't order a 1/2 batch then I will do the full 24 weeks. I believe 18 weeks is plenty tho. Don't forget I am a geno 1b (very suited to the DAAs) and I'm taking daclatasvir which has a log kill greater than ledipasvir and I personally believe it is a superior drug, only time will tell. Yeah but no reason really, flip of the coin I guess, science can't give me any additional informaiton. Em Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Emilio's Place 8 years 6 months ago #852
Hi Tweak and Nadia Yeah I definitely don't want another biopsy eewww, that felt so wrong and no fibroscan out my way lol. Talking with rachel from mesochem now to see if I can get 1/2 batch if not I'll order a full course and go from there. Swallowed them soon as I pulled them out of the mailbox. Em Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Emilio's Place 8 years 6 months ago #872
| Good luck emilio GT1a Dec14 F2/8.7 VL 900000-2.5M Jan16 Hepcivir-L MonkMed/Redemption Baseline: VL 913575 Alt 76 Platelets low Wk2 VL1157 Alt 23 DET Wk 8 VL 32 Alt19 'In the slow lane' June16 Fibro 5.7 F0/1 LIF 1.5 Wk 11 VL<12 Alt 13 Det/Unq Extending tx 12 wks Mylan Sofo/Dac MonkMed Wk 14 VL <12 Det/Unq Wk 16 VL UNDETECTED Wk 22 + 4 Wks Sunprevir FixHepC Wk 24 UNDETECTED Alt 13 Wk 12 post tx SVR12 Wk 26 SVR24 Thank-you Tim, Dr Debasis @ MonkMed & Dr Freeman @ Fix HepC |
Emilio's Place 8 years 6 months ago #926
Hi Everyone Here are my certificates from testing sofosbuvir and daclatasvir: Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Emilio's Place 8 years 6 months ago #935
Hi Amad I hope you and your dad are well? He is very lucky to have such a caring and resourceful son. Take care mate. Em Geno 1b F2/3 snce early 80s. Treated in 2008_9 for 63 weeks on INF/Riba. Commence Sof/Dac on 6 October 2015 and completed 18 weeks of tx. UND at 4-6 weeks, UND at EOT, SVR 2, SVR 6 and SVR 12 on 6 May 2016. | |
Time to create page: 0.087 seconds